10 — Mining

Resources for the long term.

ONEX holds approximately 4% of PDI Gold Limited (ASX/TSX: PDI), formerly Predictive Discovery — the West African gold producer developing the Tier-1 Bankan Gold Project in Guinea.

Overview

A strategic minority stake in West African gold.

ONEX holds approximately 4% of PDI Gold Limited (ASX/TSX: PDI), formerly Predictive Discovery Limited. It is a strategic minority shareholding: PDI Gold is independently governed and operated by its own board and management.

Following its merger with Robex Resources, the company was renamed PDI Gold Limited in 2026 and continues to trade on the ASX and TSX under the ticker PDI. Its producing assets are the Kiniéro Gold Mine in Guinea (first gold in December 2025; commercial production in February 2026) and the Nampala Gold Mine in Mali (operating since 2017). Its long-life growth asset is the Tier-1 Bankan Gold Project in Guinea, one of the largest undeveloped gold projects in Africa, which received its Exploitation Permit in November 2026.

In the September 2026 quarter, the group poured 52,865 oz of gold (Kiniéro 45,599 oz; Nampala 7,266 oz), sold 66,928 oz for revenue of US$283 million, and reported group AISC of US$1,390/oz (Kiniéro AISC US$1,246/oz). Cash and bullion stood at US$405 million at 30 September 2026; debt was US$130 million. Full-year 2026 guidance of 198,000–220,000 oz is maintained. The company targets more than 400,000 oz per annum by 2029 once Bankan is in production.

Operating figures are unaudited and drawn from PDI Gold’s Quarterly Activities Report for the quarter ended 30 September 2026 (released 30 October 2026). For reserves, resources and the latest disclosures, see PDI Gold’s ASX/TSX announcements.

Visit pdigold.com (opens in a new tab)

In numbers

Shareholding, resources, growth.

  • ~4%ONEX shareholding in PDI Gold
  • 5.53MozBankan Mineral Resources
  • 2.95MozBankan Ore Reserves
  • 250kozBankan average annual production (DFS)
  • 53kozgold poured, Sep 2026 quarter
  • >400kozgroup production target by 2029

Bankan Gold Project

One of Africa’s largest undeveloped gold projects.

Discovered in 2020 and now fully permitted for construction, with first gold targeted for mid-2028.

  • Location

    Kouroussa, Guinea

    Kouroussa Prefecture, about 30 km north-west of the Kiniéro Gold Mine; a 356 km² licence area across four exploration permits.

  • Mineral Resources

    5.53 Moz

    The NEB deposit hosts 4.89 Moz of the total. Ore Reserves: 51.6 Mt at 1.78 g/t for 2.95 Moz (as at 30 June 2026).

  • Production (DFS)

    ~250 koz a year

    Over an initial 12-year mine life, from open pits at NEB and BC and an underground mine at NEB.

  • Capital cost (DFS)

    US$463m

    AISC of US$1,111/oz at a US$3,300/oz gold price; no increase to the capital cost is anticipated in the optimised schedule.

  • Processing

    4.5 Mtpa CIL

    Gravity and carbon-in-leach plant with an SABC grinding circuit; 92.8% average recovery in the DFS.

  • Exploitation Permit

    15-year term

    Granted under Presidential Decree dated 16 November 2026, covering 98.6 km²; the Government of Guinea is entitled to a 15% interest.

Source: PDI Gold Limited — Bankan Gold Project, Reserves and Resources (ASX, 28 September 2026) and ASX announcement “Bankan and Mansounia Exploitation Permits Granted” (17 November 2026). DFS released 25 June 2025.

PDI Gold’s operations in Guinea, from the air.
PDI Gold operations team on a plant walkway in Guinea
01 / 02

Operating performance

Kiniéro is running.

Kiniéro is the group’s cornerstone producer. Construction was completed on time and on budget, with first gold in December 2025 and commercial production in February 2026. In the September 2026 quarter it milled 2.28 Mt at 88.3% recovery and poured 45,599 oz at an AISC of US$1,246/oz, with plant throughput averaging 1,095 tph — offsetting seasonal wet-season mining rates.

Nampala contributed 7,266 oz in the same quarter while cutback work progressed to improve ore access. The Mansounia Exploitation Permits, granted alongside Bankan’s in November 2026, allow mining to begin at the near-surface Mansounia deposit at Kiniéro.

A geologist logging drill core at PDI Gold’s core yard in Guinea
02 / 02

From discovery to construction

Construction-ready in Guinea.

The NEB and BC deposits at Bankan were discovered in 2020. A Definitive Feasibility Study completed in June 2025 outlined a large-scale, long-life, low-cost operation; the grant of the Exploitation Permit in November 2026 completed the key regulatory approvals required to start construction.

Detailed engineering is advancing for the process plant, power station and tailings storage facility, and US$18 million in down payments has been made for the SAG and ball mills and the 40 MW power station. An optimised schedule, capital estimate and production profile is due in early 2027, with first gold expected in mid-2028. Bankan is expected to create around 2,000 construction jobs and around 1,000 ongoing operating jobs.

Strategy & value creation

How we create value.

Disciplined ownership across the life-cycle of each asset.

01Strategic minority, listed exposure

An approximately 4% shareholding in PDI Gold provides exposure to producing West African gold mines and the Tier-1 Bankan development pipeline, without operating responsibility.

02Support through the cycle

We back management on safety, cost discipline and the path to more than 400 koz per annum by 2029.

Milestones

A clear path.

Scroll or use the arrows to move through the timeline.

  1. 2020

    NEB and BC gold deposits discovered at Bankan.

  2. Jan 2025

    Bankan ESIA approved and Environmental Compliance Certificate issued by Guinea’s Ministry of Environment.

  3. Jun 2025

    Bankan Definitive Feasibility Study completed: ~250 koz a year over 12 years, US$463m capital cost.

  4. Dec 2025

    First gold pour at the Kiniéro Gold Mine, completed on time and on budget.

  5. Feb 2026

    Kiniéro reaches commercial production, within two months of first gold.

  6. Sep 2026

    Predictive Discovery is renamed PDI Gold Limited; the ticker remains PDI on the ASX and TSX.

  7. Nov 2026

    Government of Guinea grants the Bankan and Mansounia Exploitation Permits.

  8. Mid-2028

    First gold expected at Bankan, with an optimised schedule and capital estimate due in early 2027.

  9. 2029

    PDI Gold target: more than 400 koz per annum from its Guinea hub with Bankan in production.

Footprint

Guinea and Mali.

Select a pin or a legend entry for details.

Map data: Natural Earth

Locations are approximate.

Sustainability

Responsible mining through our shareholding.

We expect investee companies to meet strong safety and community standards. PDI Gold is aligning its operations with the World Gold Council Responsible Gold Mining Principles and pursues a zero-harm safety objective.

Bankan sits next to the Peripheral Zone of the Upper Niger National Park. Its Environmental and Social Impact Assessment was approved by Guinea’s Ministry of Environment and Sustainable Development, with an Environmental Compliance Certificate issued in January 2025, and PDI Gold has committed to a reforestation programme within the Peripheral Zone. During Kiniéro’s construction, around 330 Guinean nationals were employed directly and a further 660 through local contracting businesses.

Operating detail and ESG disclosures are published by PDI Gold to the ASX and TSX and at pdigold.com/sustainability ↗ (opens in a new tab).

Portfolio

PDI Gold assets.

Showing 3 of 3

Guinea · West Africa · Development

Bankan Gold Project

Tier-1 gold development project in Kouroussa Prefecture, Guinea — one of the largest undeveloped gold projects in Africa. Mineral Resources of 5.53 Moz and Ore Reserves of 2.95 Moz. The Exploitation Permit was granted by the Government of Guinea in November 2026; the DFS outlines about 250,000 oz a year over an initial 12-year mine life.
Status
Development
Country
Guinea
Mine type
Open pit and underground

Guinea · West Africa · Producing

Kiniéro Gold Mine

PDI Gold’s flagship operating asset, in Kouroussa Prefecture about 30 km south-east of Bankan. First gold pour in December 2025 and commercial production in February 2026. Mineral Resources of 4.28 Moz and Ore Reserves of 1.78 Moz; a nine-year mine life at an average of 139,000 oz a year. September 2026 quarter: 45,599 oz poured at an AISC of US$1,246/oz.
Status
Producing
Country
Guinea
2026 guidance
157–174 koz

Mali · West Africa · Producing

Nampala Gold Mine

Open-pit gold mine in the Sikasso Region of southern Mali, producing since 2017, with a 3 Mtpa processing plant. 2026 guidance of 41,000–46,000 oz; 7,266 oz poured in the September 2026 quarter.
Status
Producing
Country
Mali

Integrated platform

How mining connects.

Each of our businesses draws on the capabilities, relationships and capital of the wider ONEX group.

← All sectors