GE 9F.04 gas turbines.
Bazian II runs on two GE 9F.04 heavy-duty gas turbines, each delivering 288 MW in simple cycle, with combined-cycle efficiency above 60%. The 9F.04 is highly fuel-flexible and starts in as little as 20 minutes in simple cycle and 30 minutes in combined cycle, with improved resilience to grid disruptions and load transients.
Overall, the Bazian site is powered by four GE Vernova 9E.03 and two 9F.04 gas turbines. In 2025 Bazian was announced as the launch site for GE Vernova’s AGP XPAND upgrade — a world first.